The new centrally located Open Plan of this office space is getting many new pieces of ceiling this week, to replace the spots where there used to be walls.  The curved shaped of the building creates a unique opportunity for a typically rectilinear ceiling system.  Splaying out from the central building core, the ceiling grid requires each tile to be a unique shape.  This technique creates a dynamic and attractive finished ceiling, especially with the sleek, integrated lighting.

The millwork components are nearly all installed, and look fantastic!  Some pieces are in the process of being assembled, so it is the perfect time to investigate the small details of construction.  I am still learning about millwork construction techniques, and this will be very helpful for drawing millwork details in the future.